Construction is carried
out in-house, where our UHV and UHP fabrication facility produces vessels
conforming to BS EN 13322-2. All welders are qualified to BSEN 287-1
and use procedures that meet ISO 15614-1 and ASME IX . All welds meet
the requirements of EN 25817 level C (Stringent) before they are helium
leak tested to better than 1 x 10-9 Torr litre/sec. |